Light blue circle Dark blue circle

United by passion, let us contribute to a responsible future

BTVA Dubourg Group

END-OF-LIFE VEHICLE TREATMENT CENTER

  • Purchased in 2022 by DUBOURG GROUPE
  • 2023 turnover: €3.8 million
  • Area: 3 hectares
  • Vehicles treated in 2023: 2,000
  • Staff: 12 people

TREATMENT AREA

  • 3 dismantling stations
  • 12 vehicles processed on average per day
  • 180 parts dismantled per day
  • Staff: 5 people

SPARE PARTS STORE

  • 15,000 pieces in stock (no generic photo)
  • Engraving, Cleaning, Photography (4 – 5 photos/piece) and Characterization of all parts after disassembly before storage
  • Recent opening of a customer counter
  • Number of parts delivered in 2023: 3,000 parts
  • Parts guaranteed for 2 years (excluding batteries and tires)
  • Open Monday to Friday from 8 a.m. to 12 p.m. then 2 p.m. to 6 p.m.
  • Staff: 3 people

THE ENVIRONMENT AT THE HEART OF OUR CONCERNS

A fully equipped site

  • Site compliant with the ICPE standard
  • Plant barriers, plant walls, flowerbeds
  • Presence of devices adapted to the treatment of runoff water
  • Storage of fluids or so-called polluting materials in double-walled containers with safety alarm, then sent to approved recycling channels
  • Electric lifting equipment suitable for carrying parts and vehicles
  • Dematerialization of the administrative service

ELV approval (end-of-life vehicles) no. PR33 00001D, meeting the specifications for service certification
“QUALICERT SGS”: www.qualicert.fr.

QUALITY SERVICE

  • A visual check carried out at each of the 5 stages of the life of the reused part, from the decision to dismantle to storage
  • Return rate: 2.7 %
  • Google Rating 4.2/5

CONTACT

Contact BTVA

To top